Girder Bridge and Rigid-frame br

Wuhai Bridge



Located in Wuhai, Inner Mongolia, it is an urban landscape bridge connecting Bohai Bay Area and Wuda Area across the Yellow River, which is 6km away from the upstream of Bohai Bay Water Control Engineering that is under construction. The project is as long as 5789m, including 5110m for the bridge. The main bridge is a (80+5×120+80)m prestressed concrete cable-stayed bridge, which has big cantilever section. The 37m-wide bridge has 8 lanes, whose two approach bridges adopt small prestressed concrete box girders with length of 40m and 30m.