Girder Bridge and Rigid-frame br

Sunkou Yellow River Bridge



It is one of the important projects of Beijing-Kowloon Railway, whose main span adopted 4-module 4×108m triangle continuous steel truss girders. And it is a 2-track railway bridge. The steel girder is as long as 1735.2m, which was made by 13600 tons of steel. All steel truss girders have adopted new overall node technology. In 1999, the bridge was rewarded Gold Prize for National Outstanding Design.