Municipal Engineering

Wuhan Gusao Tree Road Overpass



It is the second section of the engineering of Wuhan Gusao Tree Road (3rd Ring -2nd Ring), whose total length is 1.44km and investment is 560 million RMB. The bridge over Beijing-Guangzhou Railway is a (65+110+65)m bridge with continuous girders. It adopted pier-top swivel construction to cross Hankou-Xiaogan Intercity Rail, Hefei-Wuhan Railway and Beijing-Guangzhou Railway.