Railway Engineering
Changsha Power Plant Dedicated Railway
![](/upload/collect/202012/qtd8202012171151400.jpg)
It starts from Xianing Station of Beijing-Guangzhou Railway and ends at Power Plant Industry Station, which total length is 26.68km (including 6km for Laoxia Connection Line). The railway has been invested with 400 million RMB.