rail transit

Line 1 of Nanning Metro



The engineering, starting from Shibu in the west and reaching Nanning East Station in the east, has a total length of 31.6km, all of which are underground rail. It has 25 stations, including 6 transitional stations. BRDI has undertaken the design for 2 stations and 2 intervals (including underground intervals in entrance and exit) between Shibu Station (including) and Chetianping Station (excluding).