rail transit

Line 2 of Changsha Metro



The engineering, starting from West Coach Station in the west and reaching Daguang Station in the east, has a total length of 22.262km, all are buried rail. There are 19 stations. BRDI has undertaken the architecture, structure, power, air conditioning and water supply and drainage design for Wanjiali Plaza Station, Renmin East Road Station, Changsha Avenue Station and Huangxing Vehicle Section.