Survey and Investigation

Qiongzhou Strait Cross-sea Channel Engineering Solution Research and Geological Survey



With a width of 20km to 40km, the deepest water level of the strait is about 130m. the magnetic prospecting, seismic prospecting, drill prospecting, in-situ testing, and lab testing and other engineering phases have been completed through careful organization and active exploration, offering reliable evidence to the channel design.