Suspension bridge

Wenzhou Oujiang North Bridge



There is a dual 6-lane highway on the bridge with the designed speed of 100km/h. The length and width are 7.894km and 33.5m respectively. Nanjin Road was built by the standards of level-1 road with designed speed of 80km/h. The width and total length of the road are 32m and 3.870km respectively. It was constructed in the  2×800m triple-pylon double-span suspension structure with double-deck steel truss girder plane (highway in the upper-deck and Nanjin Road in the lower-deck).